Year 8 Force, Mass and Acceleration (F = ma) Worksheet — Level 3 — Answers
Answer sheet with model answers and success criteria for the Year 8 forces & motion worksheet.
Year 8 Force, Mass and Acceleration (F = ma) Worksheet — Level 3 — Answers
Use F = m × a (force in newtons, N; mass in kilograms, kg; acceleration in m/s2). Weight W = m × g, with g = 9.8 N/kg. Show your working.
1.Find the weight of a 46 kg mass on Earth. Use g = 9.8 N/kg.
Answer: 450.8 N
- W = m × g
- = 46 × 9.8 = 450.8 N
2.A 15 kg box is pushed with a force of 100 N while friction acts against it with a force of 25 N. Find its acceleration.
Answer: 5 m/s2
- net force = 100 − 25 = 75 N
- a = F ÷ m = 75 ÷ 15
- = 5 m/s2
3.An object with a mass of 28 kg has an acceleration of 7 m/s2. Find the net force on it.
Answer: 196 N
- F = m × a
- = 28 × 7 = 196 N
4.A net force of 182 N acts on an object with a mass of 26 kg. Find its acceleration.
Answer: 7 m/s2
- a = F ÷ m
- = 182 ÷ 26 = 7 m/s2
5.A net force of 333 N gives an object an acceleration of 9 m/s2. Find its mass.
Answer: 37 kg
- m = F ÷ a
- = 333 ÷ 9 = 37 kg
6.Find the weight of a 24 kg mass on Earth. Use g = 9.8 N/kg.
Answer: 235.2 N
- W = m × g
- = 24 × 9.8 = 235.2 N
7.A 18 kg box is pushed with a force of 75 N while friction acts against it with a force of 21 N. Find its acceleration.
Answer: 3 m/s2
- net force = 75 − 21 = 54 N
- a = F ÷ m = 54 ÷ 18
- = 3 m/s2
8.An object with a mass of 22 kg has an acceleration of 9 m/s2. Find the net force on it.
Answer: 198 N
- F = m × a
- = 22 × 9 = 198 N
9.A net force of 98 N acts on an object with a mass of 49 kg. Find its acceleration.
Answer: 2 m/s2
- a = F ÷ m
- = 98 ÷ 49 = 2 m/s2
10.A net force of 30 N gives an object an acceleration of 1 m/s2. Find its mass.
Answer: 30 kg
- m = F ÷ a
- = 30 ÷ 1 = 30 kg
Marking tips
- Give credit for correct method even when the final answer slips — the working shows where the thinking went right.
- For open-ended tasks, use the success criteria as a checklist rather than looking for one "right" answer.
- Celebrate what went well first, then pick one thing to work on next.